Excavator and tower crane working a commercial site in Florida
Site-work subcontractor — Apopka, FL

We move the dirt so Florida can build.

— clearing, demo, grading & everything underground

Before the building goes up, somebody has to clear the lot, knock down what's standing, dig the trenches and bury the pipe. That's us. COJ runs the full site package for general contractors — retail, restaurants, hotels and subdivisions, anywhere in Florida.

Base: Apopka, FL Range: Statewide + neighboring states In the trade since: 2017 Status: Subcontractor — not a GC

GCs: the fastest way to a number

Email the plans, the site address and your scope. No portal, no phone tree, no sales rep. Your bid request lands with the people who'll actually run the job — and we'll tell you straight if we can't hit your date.

One crew · Whole site package

Clearing through curb & gutter under one subcontract — so you're not chasing five different subs to get to pad-ready.

The Work

Scope sheet — 10 trades, one crew

This is the dirty half of construction — the part that happens before the slab and underneath it. Everything below is work we self-perform as a subcontractor on GC-run jobs.

Crew setting large-diameter underground pipe in a deep trench
Underground utilities · illustrative photo
Dozer pushing and grading earth on a job site
Grading & earthwork · illustrative photo
Excavator tearing down a structure
Demolition · illustrative photo

The trade photos in this section are illustrative. Every photo in the Job Log below is COJ's own crew on COJ's own jobs.

/01

Site Development

The complete package — raw lot to building pad for commercial and residential jobs, sequenced around your schedule and the other trades.

/02

Land Clearing

Trees, brush and stumps out; debris hauled or burned per permit. We leave you a lot you can actually stake.

/03

Grading & Earthwork

Cut and fill, building pads, retention ponds and swales — built to the plans and compacted so it passes testing the first time.

/04

Demolition

Structures down and sites cleaned out. Regular demolition only — no blasting, no wrecking balls, no tunneling. Ever.

/05

Underground Water

Water mains and services, set and pressure-tested, tied in and ready for the meter.

/06

Sanitary & Storm

Sewer, storm drain and manholes — trench work down to 15 feet, with dewatering when the Florida water table says otherwise.

/07

Lift Stations

Wastewater lift stations built complete — wet well, pumps, piping and tie-ins.

/08

Sidewalks & Curbs

Formed, poured and finished — sidewalks, curb and gutter that dress the site up at the end of the job.

/09

Parking Lots

Base, paving prep and lot construction for retail and commercial sites.

/10

Fire Lines & Backflows

Fire mains, hydrants and backflow assemblies — installed, tested and ready for the fire inspection.

The Job Log

12 jobs · 81 photos from our own sites

Every project in this log is a real COJ job — site work and demo for national brands and local builds, from Panama City to Belle Glade. GCs and owners: if you've got photos of our crews on your job, send them — this log is where they'll live.

01

Dutch Bros Coffee

Davenport, FLCoffee · drive-thru

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule.

Finished drive-thru and ADA ramp at Dutch Bros Coffee, Davenport.6 photos
Finished drive-thru and ADA ramp at Dutch Bros Coffee, Davenport.
Night pour at the drive-thru, beneath the illuminated Dutch Bros windmill.
Night pour at the drive-thru, beneath the illuminated Dutch Bros windmill.
Crew screeding the fresh concrete drive-thru pour.
Crew screeding the fresh concrete drive-thru pour.
Crew hand-finishing the new sidewalk beside the drive-thru lane.
Crew hand-finishing the new sidewalk beside the drive-thru lane.
Crew setting curb along the trench at the drive-thru.
Crew setting curb along the trench at the drive-thru.
Freshly poured curved sidewalk and curb, night pour.
Freshly poured curved sidewalk and curb, night pour.
02

O’Reilly Auto Parts

Belle Glade, FLRetail pad · underground

Site development and demolition for an O’Reilly Auto Parts store — the classic retail pad job: clear it, grade it, service it, turn it over ready for vertical. This gallery is the underground half of the job — the stormwater detention system, pipe work and water service going in.

Underground stormwater detention system — five large-diameter pipes installed in a lined, gravel-bedded basin.8 photos
Underground stormwater detention system — five large-diameter pipes installed in a lined, gravel-bedded basin.
Crew at work in the detention basin at the SR 80 intersection, with large storm pipes staged behind them.
Crew at work in the detention basin at the SR 80 intersection, with large storm pipes staged behind them.
COJ crew installing storm pipe in an open trench alongside the roadway.
COJ crew installing storm pipe in an open trench alongside the roadway.
Perforated detention pipes with elbow connections, backfilled with clean stone.
Perforated detention pipes with elbow connections, backfilled with clean stone.
Crew member cutting storm pipe with a cutoff saw in the trench.
Crew member cutting storm pipe with a cutoff saw in the trench.
Technician making a live water-main tap with a tapping machine and gate valve.
Technician making a live water-main tap with a tapping machine and gate valve.
Completed backflow preventer assembly with dual gate valves, ready for service.
Completed backflow preventer assembly with dual gate valves, ready for service.
Grading the site in front of the completed O'Reilly Auto Parts storefront.
Grading the site in front of the completed O'Reilly Auto Parts storefront.
03

O’Reilly Auto Parts

Fellsmere, FLRetail pad · full sequence

Site development and demolition for an O’Reilly Auto Parts store — the classic retail pad job: clear it, grade it, service it, turn it over ready for vertical. The photos run the job in sequence — clearing, excavation and utilities, concrete, then finished paving.

New asphalt, curb, and landscaping in front of the finished O'Reilly Auto Parts store.8 photos
New asphalt, curb, and landscaping in front of the finished O'Reilly Auto Parts store.
Concrete pour in progress — JCB excavator and mixer trucks on site as the building goes up.
Concrete pour in progress — JCB excavator and mixer trucks on site as the building goes up.
Crew connecting the water main — tapping valve on the blue ductile-iron pipe.
Crew connecting the water main — tapping valve on the blue ductile-iron pipe.
Two COJ crew members setting gravel base in a deep excavation.
Two COJ crew members setting gravel base in a deep excavation.
Green sewer main installed in open trench, running to the manhole.
Green sewer main installed in open trench, running to the manhole.
Precast concrete storm inlet set on a gravel base.
Precast concrete storm inlet set on a gravel base.
Retention pond and graded banks taking shape.
Retention pond and graded banks taking shape.
Aerial view of the cleared site at the start of construction.
Aerial view of the cleared site at the start of construction.
04

Dutch Bros Coffee

Gainesville, FLCoffee · underground phase

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule. This set is the underground phase — grease interceptor, sewer and water service in progress.

Grease interceptor set in place, with the finished building behind it.8 photos
Grease interceptor set in place, with the finished building behind it.
Crew setting water service, with a skid steer working behind them.
Crew setting water service, with a skid steer working behind them.
Concrete storm inlet installed below the finished stone-veneer building.
Concrete storm inlet installed below the finished stone-veneer building.
Crew installing underground sewer piping in open trench.
Crew installing underground sewer piping in open trench.
Deep utility trench cut through the site.
Deep utility trench cut through the site.
Grease interceptor lowered into excavation.
Grease interceptor lowered into excavation.
Storm pipe tied into a precast concrete structure.
Storm pipe tied into a precast concrete structure.
Grading the site, with roller and telehandler at work.
Grading the site, with roller and telehandler at work.
05

Dutch Bros Coffee

Goldenrod — Orlando, FLCoffee · drive-thru

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule.

Mini-excavator grading beside fresh concrete curb and sidewalk.7 photos
Mini-excavator grading beside fresh concrete curb and sidewalk.
Roller compacting the graded drive-thru lane under a clear blue sky.
Roller compacting the graded drive-thru lane under a clear blue sky.
Fresh asphalt drive-thru lane beside the finished stone-clad building.
Fresh asphalt drive-thru lane beside the finished stone-clad building.
The completed drive-thru canopy and Dutch Bros pylon sign, with new concrete sidewalk and curb.
The completed drive-thru canopy and Dutch Bros pylon sign, with new concrete sidewalk and curb.
Drive-thru canopy and stone pillars with new concrete curb and walkway.
Drive-thru canopy and stone pillars with new concrete curb and walkway.
New red fire-line and blue water valves and backflow assembly in an open trench.
New red fire-line and blue water valves and backflow assembly in an open trench.
Night utility tie-in under floodlights, with excavator and crew at work.
Night utility tie-in under floodlights, with excavator and crew at work.
06

Dutch Bros Coffee

Eustis, FLCoffee · site work in progress

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule. Every shot here is site work in progress — demolition and clearing, grading and underground utilities.

Excavator at work above a newly laid green sewer main, running the length of the trench.7 photos
Excavator at work above a newly laid green sewer main, running the length of the trench.
Storm-drain trench with risers set, excavator working at the far end of the site.
Storm-drain trench with risers set, excavator working at the far end of the site.
Crew member fine-grading a trench by hand as the sewer line is laid.
Crew member fine-grading a trench by hand as the sewer line is laid.
Storm pipe fittings set on gravel bedding, checked with a level.
Storm pipe fittings set on gravel bedding, checked with a level.
Underground utilities in place across the site — interceptor and sewer risers under a clear sky.
Underground utilities in place across the site — interceptor and sewer risers under a clear sky.
Crew setting grade over a gravel bedding layer in the excavation.
Crew setting grade over a gravel bedding layer in the excavation.
Demolition and site clearing under way, JCB excavator working the debris.
Demolition and site clearing under way, JCB excavator working the debris.
07

Dutch Bros Coffee

Panama City, FLCoffee · drive-thru

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule.

Crew installing green sewer mains in a deep trench at the Dutch Bros Panama City site.7 photos
Crew installing green sewer mains in a deep trench at the Dutch Bros Panama City site.
The finished Dutch Bros building with new concrete drive and block dumpster enclosure.
The finished Dutch Bros building with new concrete drive and block dumpster enclosure.
Sewer main installation continues down the trench, with foundation formwork taking shape behind.
Sewer main installation continues down the trench, with foundation formwork taking shape behind.
Storm drain pipe runs into the building foundation, with a JCB telehandler working behind.
Storm drain pipe runs into the building foundation, with a JCB telehandler working behind.
Freshly graded site and new concrete drive-through paving at Dutch Bros Panama City.
Freshly graded site and new concrete drive-through paving at Dutch Bros Panama City.
Setting a manhole structure, seen from the excavator operator's seat.
Setting a manhole structure, seen from the excavator operator's seat.
Excavator working over the open trench as green sewer pipe is laid in gravel bedding.
Excavator working over the open trench as green sewer pipe is laid in gravel bedding.
08

Dutch Bros Coffee

Daytona Beach, FLCoffee · shared site with Take 5

Part of our six-location Dutch Bros run — ground-up site packages for new coffee shops: clearing and demo where something stood before, grading, underground utilities and pad work, town after town on a fast-food schedule. Dutch Bros and Take 5 went up side by side on this one site, so the two galleries share the same underground and grading shots.

Near-finished Dutch Bros exterior — stone columns, wood soffit and new curb, with site grading under way.9 photos
Near-finished Dutch Bros exterior — stone columns, wood soffit and new curb, with site grading under way.
Crew finishing the Dutch Bros storefront as a lift installs signage and a roller compacts the lot.
Crew finishing the Dutch Bros storefront as a lift installs signage and a roller compacts the lot.
Finishing work at the Dutch Bros entrance — bollards, sidewalk and compaction equipment.
Finishing work at the Dutch Bros entrance — bollards, sidewalk and compaction equipment.
COJ crew installing a large stormwater pipe in a deep trench, lowering it to a manhole.
COJ crew installing a large stormwater pipe in a deep trench, lowering it to a manhole.
Blue water main laid in a long open trench across the site.
Blue water main laid in a long open trench across the site.
Water line running down a graded trench toward the neighbouring apartments.
Water line running down a graded trench toward the neighbouring apartments.
New concrete storm inlet box with corrugated pipe set and grouted in.
New concrete storm inlet box with corrugated pipe set and grouted in.
Storm pipe in a trench at sunset — work lights on under an orange sky.
Storm pipe in a trench at sunset — work lights on under an orange sky.
Fresh concrete curb and graded drive lane beside the construction site.
Fresh concrete curb and graded drive lane beside the construction site.
09

Take Five Oil Change

Daytona Beach, FLRetail · Volusia County

Site development and demo for a quick-lube build — small footprint, full underground package, in and out on a retail schedule. Built side by side with the Daytona Beach Dutch Bros, so the two galleries share the same sitework shots.

Finished Take 5 Oil Change — red-framed service bays — with fresh concrete sidewalk and equipment on the graded lot.12 photos
Finished Take 5 Oil Change — red-framed service bays — with fresh concrete sidewalk and equipment on the graded lot.
Grading the Take 5 lot — skid steer and crew at work in front of the red-bayed building.
Grading the Take 5 lot — skid steer and crew at work in front of the red-bayed building.
Take 5 service bays under construction, with sewer work in the trench in front — Dutch Bros visible behind.
Take 5 service bays under construction, with sewer work in the trench in front — Dutch Bros visible behind.
Sewer riser and pipe run at the Take 5 building's framed bays.
Sewer riser and pipe run at the Take 5 building's framed bays.
Take 5 framing and scaffolding — crew working the exterior wall above the new sidewalk forms.
Take 5 framing and scaffolding — crew working the exterior wall above the new sidewalk forms.
Water-line trench running alongside the Take 5 building under a clear blue sky.
Water-line trench running alongside the Take 5 building under a clear blue sky.
COJ crew installing a large stormwater pipe in a deep trench, lowering it to a manhole.
COJ crew installing a large stormwater pipe in a deep trench, lowering it to a manhole.
Blue water main laid in a long open trench across the site.
Blue water main laid in a long open trench across the site.
Water line running down a graded trench toward the neighbouring apartments.
Water line running down a graded trench toward the neighbouring apartments.
New concrete storm inlet box with corrugated pipe set and grouted in.
New concrete storm inlet box with corrugated pipe set and grouted in.
Storm pipe in a trench at sunset — work lights on under an orange sky.
Storm pipe in a trench at sunset — work lights on under an orange sky.
Fresh concrete curb and graded drive lane beside the construction site.
Fresh concrete curb and graded drive lane beside the construction site.
10

Dollar Tree

St. Cloud, FLRetail · full site package

Full site package for a new Dollar Tree — earthwork, underground and pad, taken to 100% complete.

Finished Dollar Tree storefront with the graded parking lot and a motor grader at work.7 photos
Finished Dollar Tree storefront with the graded parking lot and a motor grader at work.
Wide view of the completed Dollar Tree building across the newly graded site.
Wide view of the completed Dollar Tree building across the newly graded site.
Crew member guiding a precast concrete manhole into place as the excavator lowers it.
Crew member guiding a precast concrete manhole into place as the excavator lowers it.
Site grading in progress beside the building, with lift equipment on site.
Site grading in progress beside the building, with lift equipment on site.
New concrete sidewalk along the finished Dollar Tree building.
New concrete sidewalk along the finished Dollar Tree building.
Precast concrete storm inlet structure set in the excavation.
Precast concrete storm inlet structure set in the excavation.
Crew member laying geotextile fabric in a deep excavation.
Crew member laying geotextile fabric in a deep excavation.
11

Windermere Collision Center

Winter Garden, FLCommercial · groundwork

Site development for a collision center build — a working commercial site with real drainage and utility demands, not just a pad in a field. These photos are the early groundwork: excavation, water and fire-service lines, slab prep and a night pour.

Twin blue water lines laid in a deep trench, with a JCB excavator at work beside them.8 photos
Twin blue water lines laid in a deep trench, with a JCB excavator at work beside them.
Night concrete pour — the crew at work across the lit, steel-reinforced slab.
Night concrete pour — the crew at work across the lit, steel-reinforced slab.
Concrete pump truck and mixer working through the night over the prepared slab.
Concrete pump truck and mixer working through the night over the prepared slab.
JCB excavator grading the site beside the formed, steel-reinforced slab.
JCB excavator grading the site beside the formed, steel-reinforced slab.
Crew setting fire-service risers in the trench, checking level as they work.
Crew setting fire-service risers in the trench, checking level as they work.
Fire-service connection and protective bollard installed above the blue water main.
Fire-service connection and protective bollard installed above the blue water main.
Paired risers rising through the rebar and vapour barrier ahead of the slab pour.
Paired risers rising through the rebar and vapour barrier ahead of the slab pour.
The graded site under a clear sky, with the excavation cut in the foreground.
The graded site under a clear sky, with the excavation cut in the foreground.
12

Cambria Hotel

International Dr — Orlando, FLHospitality · I-Drive corridor

Site development for a hotel build on one of the busiest tourist strips in the state — tight site, tighter neighbors, work sequenced around a corridor that never slows down.

your project could be the next one in this log → Add Yours — Request a Bid

How a job runs

No middlemen · No runaround
1

You send plans

Plans, site address, scope — email is fine. That's genuinely all we need to start pricing. If something's missing, we'll ask once, not five times.

2

You get a real number

A line-item price for the site package — what it costs, what's included, what's not. No vague allowances hiding a change-order fight later.

3

Iron shows up

Crews and equipment mobilize on your schedule — silt fence up, site secured, work sequenced with the trades coming behind us.

4

Pad-ready, turned over

Graded to plan, utilities tested and passed, site cleaned up. We hand you a lot your vertical crews can go straight to work on.

rain delays happen in Florida — you'll hear it from us first, not last.

Straight talk

About COJ — the short version

COJ Construction LLC is a small, hands-on Florida site-work crew out of Apopka. The owner has been in construction since 2017 and formed COJ in 2020. Since then the company has run site packages all over the state — coffee shops, auto parts stores, a hotel, a collision center — mostly for repeat GCs who call again because the first job went the way it was supposed to.

We're not the biggest site contractor in Florida and we're not trying to be. We're the one that answers, shows up with its own plan for the dirt, and doesn't disappear when the trench hits water.

Read this part: we are not a general contractor.

COJ bids and performs site-work packages as a subcontractor under a general contractor. If you need a GC, you need someone else to run your job — then hire us to do the site work under them.

Forestry mulcher clearing brush and trees off a lot
Land clearing · illustrative photo
Red hydrant and new fire line going in an open trench
Fire lines & backflows · illustrative photo
  • WhoOwner-operated Florida LLC — the person who prices your job is connected to the crew that builds it.
  • WhereBased in Apopka. Work history from Panama City to Belle Glade — and we'll cross a state line for the right job.
  • WhatComplete site package: excavation & grading, concrete, paving, underground water / sewer / storm, demolition, manholes.
  • DepthUnderground work down to 15 ft — with the shoring and dewatering that takes in Florida ground.
  • LimitsRegular demolition only. No blasting, no dynamite, no wrecking balls, no tunneling. No traffic-signal work.
  • Work forGeneral contractors, on commercial and residential developments — public streets and roads when the job calls for it.
Fresh concrete sidewalk running from a new parking lot to a building
Sidewalks, curbs & lots · illustrative photo
Excavator and crane over a commercial construction site
Site development · illustrative photo

Run iron? Lay pipe? We hire.

Operators, pipelayers and site-work hands — if you know your way around a trench box and a grade stake, we want to hear from you. Florida work, a crew that looks out for each other, and room to move up.

tell us what you've run and where you've worked ↓
Apply by Email
COJ Construction LLC — Bid Desk

Request a bid

Email is the main line — it goes straight to the bid desk, not a call center. Send the plans and the address and you'll hear back from somebody who knows the work.

Email — main contact cojconstructionllc566@gmail.com

Plans + site address + scope = fastest price.

WhatsApp — quick questions +1 (407) 760-7442

WhatsApp only on this number — messages, not calls.

Open WhatsApp →
Subcontractor only — not a GC

Based in Apopka · working all over Florida · neighboring states by request.

Form: Bid RequestSend via your email app

Put it in writing

Fill this out and it opens in your email, addressed to us — nothing sends until you hit send there. Attach your plans to that email.

Rather write it yourself? cojconstructionllc566@gmail.com

Get a Bid WhatsApp